Who sanctions your Delhi building now that MCD is one body, what the new Master Plan for Delhi 2047 allows on your plot, and how online sanction, regularisation and the OC work.
Before you rely on any of this: Delhi's planning rules changed on 20 August 2026, when the Master Plan for Delhi 2047 came into force. This guide was updated in October 2026 for that change, and everything below links to its official source. Confirm the current position on the portal, or with an architect who has recently filed in your area, before you spend money. This is a plain-English guide, not legal advice.
In Delhi, getting a building plan sanctioned comes down to two questions: what the Master Plan says your land may be used for, and which body sanctions buildings where your plot sits. For most houses the answer to the second is the Municipal Corporation of Delhi (MCD), and for small residential plots the sanction is now released online on your architect's filing.
The bigger news is the rulebook. The long-awaited Master Plan for Delhi 2041 was never notified; instead the Master Plan for Delhi 2047 was notified on 20 August 2026 and has replaced MPD-2021.
The North, South and East Delhi Municipal Corporations were subsumed into a single Municipal Corporation of Delhi by the Delhi Municipal Corporation (Amendment) Act, 2022, and a Home Ministry notification (S.O. 2303(E)) constituted the unified corporation on 22 May 2022. Any guide that tells you to file with "SDMC" or "North MCD" is out of date.
If a seller cannot tell you which authority applies, treat it as a warning sign. Our plot due diligence checklist covers the other checks to run before you pay.
The Ministry of Housing and Urban Affairs notified MPD-2047 by S.O. 4597(E) dated 20 August 2026, under Section 11-A of the Delhi Development Act, 1957, as an extensive modification of MPD-2021. It came into effect on publication. The notification records that it follows the draft modifications DDA published for objections in June 2021, the draft widely known as MPD-2041, which was finally approved with a 2047 horizon.
DDA's FAQs on MPD-2047 confirm that it supersedes MPD-2021, that plans approved earlier continue under the earlier norms until you take additional FAR or a revised sanction, and how to find your land use: read the Use Zone on DDA's Land Use Plan 2047, then the Use Premise on the approved layout plan for your colony.
Some portal pages still link to MPD-2021. Work from MPD-2047, which DDA publishes in full on its Master Plan for Delhi 2047 page.
Table 7.2 of the notified plan sets the development controls for plotted housing. For the plot sizes most families build on:
| Plot area | Max. ground coverage | Max. FAR | Max. dwelling units |
|---|---|---|---|
| Up to 50 sq m | 90% | 350 | 3 |
| 50 to 100 sq m | 90% | 350 | 4 |
| 100 to 250 sq m | 75% | 300 | 4 |
| 250 to 750 sq m | 75% | 225 | 5 |
| 750 to 1,000 sq m | 50% | 200 | 7 |
The same table sets a minimum plot of 32 sq m, a height limit of 15 m (ground plus three floors) without stilt parking or 17.5 m (stilt plus four floors) with it, and makes stilt parking mandatory on plots from 100 to 750 sq m. Residential plots may not be subdivided, and only two plots of up to 64 sq m may be amalgamated. If FAR and coverage are new terms, our explainer on setbacks, FAR and height limits walks through them.
How the building is designed, documented and sanctioned is governed by the Unified Building Bye-Laws (UBBL) for Delhi 2016, notified by S.O. 1191(E) on 22 March 2016. DDA's building approval department page lists the amendments since then, the latest being S.O. 2615(E) of 29 June 2021, and DDA hosts the bye-law and amendment files on its building bye-laws page. According to DDA, UBBL 2016 brought in risk-based classification of buildings, a maximum of 30 days for local bodies to grant a permit, outside NOCs (NMA, Delhi Fire Service, AAI, DUAC, DMRC and others) folded into the online process, environment clearance built into the sanction for buildings of up to 1,50,000 sq m, and the Saral scheme for residential plots of up to 105 sq m.
MCD's portal is blunt about the first requirement: the plot should be part of an approved layout plan. Look them up on MCD's Town Planning citizen page. Check the Land Use Plan 2047 too: a permit does not cure a use the plan forbids.
Delhi has no routine "agricultural to residential" conversion counter like Maharashtra's or Karnataka's. On our reading of MPD-2047, outer farmland is governed by policy, not plot-by-plot conversion:
If a plot is sold as "agricultural land, house allowed", ask in writing which of these categories it falls in before you pay anything.
2026 brought real change for Delhi's unauthorised colonies.
Regularising a colony does not sanction your building: a new floor or a rebuild still needs a filed plan.
MCD's citizen corner sorts fresh residential plans by risk and plot size:
Who may file matters. MCD allows an empanelled architect to prepare plans for a plot of any size, an engineer up to 500 sq m and a supervisor up to 200 sq m. That is the practical reason to appoint an architect early: the person who signs your drawings is the person who files them.
Fees. MCD's schedule of charges (dated 1 October 2024) sets the building permit fee at ₹10 per sq m of built-up area, including basement and stilt, plus an IT charge of ₹2,000 for a Saral plan or ₹5,000 for a plot up to 500 sq m. Other charges, such as construction waste, material stacking and additional FAR, depend on the plot and the colony category, and the schedule lists a special charge for agricultural, Low Density and land pooling land. For a realistic construction budget once the sanction is in hand, see our Delhi NCR construction cost breakdown.
The plinth certificate. Once the plinth is built, you apply with documents and photographs, and the authority inspects it against the sanctioned plan before you go higher, according to MCD's stages of approval. MCD's charges schedule, citing UBBL 2016, sets a ₹500 fee for the plinth intimation.
The completion and occupancy certificate. On completion, the authority inspects for FAR, setbacks and fire safety before issuing it. Occupying without one is not free: MCD's charges schedule lists a pre-occupancy charge of ₹25,000 per dwelling unit for residential buildings occupied without a completion-cum-occupancy certificate.
Validity. A permit can be revalidated for up to five years at a time, at ₹10 per sq m of built-up area per year. If you are planning a small house, our guide to what you can build on a small plot shows how these rules shape the design.
No. MPD-2041 stayed a draft. The Centre notified the Master Plan for Delhi 2047 on 20 August 2026 (S.O. 4597(E)), and it supersedes MPD-2021. Plans sanctioned earlier remain valid.
Under UBBL 2016, local bodies have a maximum of 30 days to grant a permit. For a house of up to 500 sq m in MCD's area with no NOC, the sanction is released online once your professional's filing passes the automatic check and the fees are paid.
Not on a building permit alone. In land pooling areas, development happens only through the land pooling policy; in Low Density Areas, a residential plot needs at least 10,000 sq m.
Ownership has to be recognised first, under the 2019 regulations. New construction must follow municipal norms, so you still need a sanctioned plan.
Approvals go faster with someone who has filed in your area before. Browse architects practising in Delhi on MOA, see their published work and message them directly, with no commission on either side.