How Ateliers Jean Nouvel's Louvre Abu Dhabi works: a 180 m dome of eight patterned layers on four piers, a museum city of 55 blocks in the sea, and the rain of light, with MOA diagrams.
The Louvre Abu Dhabi is an art museum on Saadiyat Island in Abu Dhabi, designed by Ateliers Jean Nouvel and opened to the public on 11 November 2017. Its main idea is a climate one: a 180 m wide dome of eight patterned metal layers shades a cluster of white buildings set in the sea, and lets through only small, moving spots of sun that Nouvel calls a "rain of light". This case study explains the dome, the plan, the structure and the climate strategy with MOA diagrams, and points to where you can see the real drawings.
Louvre Abu Dhabi: the facts
Architect: Ateliers Jean Nouvel (Jean Nouvel), with Hala Wardé (HW architecture) as partner architect and Pascall + Watson as local architects.
Engineers: Arup (initial sketch phase, 2006), BuroHappold (sketch phase through construction), Transsolar (initial microclimate concept), Setec (seismic). Waagner-Biro built the steel dome.
Client: Tourism Development & Investment Company (TDIC), Abu Dhabi, with Agence France-Muséums as project management assistant.
Years: Nouvel selected in 2006; intergovernmental agreement between the UAE and France signed on 6 March 2007; opened 11 November 2017. Architect magazine dates construction 2013 to 2017, while Dezeen wrote that it took eight years to build.
Type: universal art museum with permanent galleries, temporary exhibitions, a children's museum, an auditorium, restaurant, café and shop.
Size: 97,000 m² gross (Ateliers Jean Nouvel). Other published figures differ; see the plan section.
Status: open to visitors. Not on the UNESCO World Heritage List.
Why there are no photographs here. Wikimedia Commons notes that the UAE has no usable freedom of panorama for buildings, and Jean Nouvel's work is still in copyright. So MOA uses its own diagrams. For photographs and the real drawings (site plan, ground floor plan, roof plan, sections, the dome pattern and the dome layers), see the ArchDaily project page and the Ateliers Jean Nouvel project page. Our guide on how to do an architecture case study shows how to turn them into study sheets.
The museum comes from an agreement between two governments. Architectural Record reports that Nouvel was selected in 2006 and that the UAE and France signed their intergovernmental agreement on 6 March 2007 (Architectural Record, Josephine Minutillo, 7 November 2017). Under it, thirteen French museums, including the Musée du Louvre, lent works for the opening. The client was TDIC, the developer of Saadiyat Island's Cultural District, and Ateliers Jean Nouvel lists the commission as a direct one, covering architecture, interiors and museography (Ateliers Jean Nouvel).
The programme is a full museum: permanent galleries, temporary exhibition space, a children's museum, an auditorium, storage, restoration workshops, administration, a restaurant, café and shop. A museum text published before the opening gave about 6,400 m² of permanent galleries, about 2,000 m² for temporary exhibitions and about 200 m² for the children's museum (Metalocus, 9 September 2017).
Saadiyat Island lies just off the city of Abu Dhabi, in a hot desert climate and an earthquake zone (Dezeen, India Block, 11 December 2017). When the project began, Nouvel recalled, "There was nothing but sand and water" (Architectural Record). Rather than placing a building on the shore, the design brings the sea in. Architect magazine's project text describes "a built archipelago in the sea", and Wallpaper* describes the sea entering the site as pools and channels between the buildings, which it compares to a traditional falaj canal (Wallpaper*, Harriet Thorpe, 7 November 2017).
The concept has two parts. The first is the dome. Nouvel calls it "a major symbol of Arab architecture" (Dezeen, Jessica Mairs, 7 November 2017), and on his studio's site he presents his version as a modern proposal that departs from the traditional form. It is not a masonry vault. It is a wide, shallow, perforated disc that works as a parasol.
The second is the city underneath. The museum text describes 55 white buildings, 23 of them galleries, inspired by the medina and low-lying Arab settlements (Metalocus). Hala Wardé put it simply: "We didn't want to do a building, we wanted to create a neighborhood" (Architectural Record). Visitors move between galleries along outdoor walkways, plazas and water, so the walk between rooms is part of the visit. Nouvel described the result to Wallpaper* as "a little city with its own micro climate".
Read the plan as three layers stacked on one platform: the sea around and between, the cluster of closed blocks, and the dome over most of it. Four piers that carry the dome are hidden inside buildings, so the plaza under the centre is open.
Sources do not agree on the numbers, so quote them with their source:
For the real layout, ArchDaily's gallery has the ground floor plan, key plans for each zone and a permanent galleries key plan.
The dome is 180 m in diameter. The museum text gives an interior height of 29 m from the ground floor to the underside of the inner cladding, and a highest point 36 m above the ground floor and 40 m above sea level (Metalocus). That makes it a very shallow dome: wide, thin and low over the buildings.
Four supports, not a ring. A masonry dome pushes down all round its edge. This one rests on four permanent piers about 110 m apart, which form a square below the circle, as BuroHappold's structural lead Andy Pottinger explained to Dezeen. BuroHappold writes that the design began with five supports and was reduced to four, "none of which restrain the dome laterally", and that reaching the final structure took over a year and 23 analysis models (BuroHappold, Andy Pottinger).
Layers and frame. The dome has four outer cladding layers of stainless steel and four inner layers of aluminium, separated by a steel frame about 5 m deep (Architect magazine project data; Metalocus). One later account gives the depth as 7 m, so treat 5 m as the figure in the project's own descriptions. Pottinger told Dezeen that the solution came when the engineers started again from Nouvel's own base pattern, and Dezeen reported that no straight line in the design is longer than 10 m.
Movement and earthquakes. Each pier carries a curved surface sliding bearing. The bearings isolate the dome in an earthquake and let the steel move with temperature: Pottinger said the dome can expand by about 180 mm during the day and shrink back at night (Dezeen, December 2017).
Architect magazine reports that about 10,000 steel components were pre-assembled into 85 large elements weighing up to 50 tonnes each. The National reported in December 2014 that the canopy, about 7,000 tonnes of steel, was built on 120 temporary towers by the Austrian firm Waagner-Biro Stahlbau. It was then jacked up by about 38 cm with 32 hydraulic jacks, freeing the towers, and lowered onto its four permanent supports (The National, James Langton and Nick Leech, 14 December 2014). The same report said the cladding stars would add about 2,000 tonnes to the load on the bearings. Some later accounts give other totals for the dome's weight; we did not find one on a project or engineering page we could open, so we give the dated 2014 figures.
Below the dome, Architect magazine lists 3,900 ultra-high-performance concrete (UHPC) facade panels on the buildings. Wallpaper* describes white concrete blocks outside and stone floors framed in bronze inside the galleries, with the stone changing with the period of the art on show.
The rain of light is the dome's main job. Each layer repeats a star-based geometric pattern at a different size and angle, so a ray of sun must pass all eight layers before it reaches the ground, and the spots move as the sun moves (Metalocus). Wardé told Wallpaper* that the members "are thinner where more light is needed and thicker in others where we needed shade", and Wallpaper* reported that only 1.8% of sky light reaches the centre. Pottinger told Dezeen that Nouvel's studio supplied luminance maps, and the engineers tuned the cladding to match them.
How many stars are there? Architect magazine and Wallpaper* give 7,850. The National's 2014 construction report gave 7,600 aluminium stars, and Dezeen in 2017 said "almost 8,000". Use 7,850 with its source, and note the others.
Climate. The museum text says the dome acts as a shading canopy over the plaza and buildings, "providing local comfort and reducing building energy consumption" (Metalocus). Ateliers Jean Nouvel credits Transsolar with the initial microclimate concept, and BuroHappold lists daylight analysis and marine works in its scope. We found no published measurement of how much cooler it is under the dome, so treat the cooling as a design claim. The galleries themselves are closed rooms with their own climate control. Visitors walk between them in shade and beside water, which is the "micro climate" Nouvel describes.
Early reviews of the building were largely positive. The National's round-up of first reviews (9 November 2017) quotes Oliver Wainwright of The Guardian calling the building and its water "mesmerising", and Nick Trend of The Telegraph praising galleries with occasional windows on the sea and sky, while adding that the finishing touches feel as if "they had too much money to spend" (The National, James Langton).
There were problems too. The project ran late: in 2014 the opening was planned for 2015 (The National), and Wallpaper* wrote that the global financial crisis delayed it by three years. Construction conditions were questioned. In February 2015, Human Rights Watch published its third report on migrant workers on Saadiyat Island, describing withheld wages, unrepaid recruitment fees and deportations after strikes, including a worker from the Louvre site after an October 2013 strike. TDIC disputed the findings, saying they did not reflect the reality on the ground (Human Rights Watch, 10 February 2015).
These are our reading, not lessons the architects stated.
If you are choosing a thesis on a museum or cultural building, our list of B.Arch thesis topics by typology has related briefs. Our Louvre Pyramid case study, also being added to this series, makes a useful comparison: two Louvre buildings, one a glass entrance in Paris and one a shade roof in the Gulf.
The museum is in the Cultural District of Saadiyat Island, Abu Dhabi. Check opening hours, tickets and current exhibitions on the Louvre Abu Dhabi website before you go, as they change. For a study visit, plan to see the plaza at different times of day: the rain of light moves with the sun, and the dome reads differently at night.
Ateliers Jean Nouvel, led by Jean Nouvel, with Hala Wardé as partner architect. BuroHappold engineered the project from the sketch phase through construction, after Arup's initial work in 2006, and Waagner-Biro built the steel dome.
It opened to the public on 11 November 2017. The agreement between the UAE and France was signed on 6 March 2007.
It is 180 m in diameter and rests on four piers about 110 m apart. The museum text gives its highest point as 36 m above the ground floor, with 29 m clear to the underside of the cladding. It has eight cladding layers: four of stainless steel outside and four of aluminium inside.
It is Nouvel's name for the effect of sun filtering through the eight patterned layers of the dome. Small spots of light fall on the plaza and walkways and move through the day. Wallpaper* reported that about 1.8% of sky light reaches the centre.
We did not find a published construction cost in the project and engineering sources we opened. Figures that circulate in the press usually refer to the agreement between the two governments, not to the building, so check what a number covers before you quote it.
Planning a building with this kind of climate thinking? Find an architect on MOA.