Suzlon One Earth is the global headquarters of Suzlon Energy, the wind turbine maker, in Hadapsar, Pune. Christopher Charles Benninger and his Pune practice, CCBA, designed it as a campus of low office blocks around a central garden and a sunken water court, and it was completed in October 2009. It holds LEED Platinum and a GRIHA five-star rating. Below: the brief, site, plan, section, materials, climate strategy, the energy figures as each source publishes them (they do not agree), and what designers can take from it.
Suzlon One Earth: the facts
Architect: Christopher Charles Benninger, CCBA (credited as CCBA Designs by ArchDaily, with a team led by Jagdeesh Taluri, Sushilkumar Khairnar and Daraius Choksi among others).
Conceived and managed by: Synefra Engineering & Construction, a Tanti Group company. Other credits (ArchDaily and GRIHA): Environmental Design Solutions (green building and energy), Spectral Services Consultants (MEP), Vastech (structure), Vascon Engineers (prime contractor), Ravi and Varsha Gavandi (landscape), Space Matrix and Tao Architects (interiors).
Client: Suzlon Energy Limited. Location: One Earth, Hadapsar, Pune 411028, Maharashtra.
Dates: designed from 2005 (CCBA's 2009 project text) or 2006 (CCBA's site gives 2006 to 2009); completed October 2009; LEED Platinum citation presented in Washington DC in April 2010; GRIHA five-star final rating on a sheet dated May 2013.
Type: corporate headquarters for about 2,300 people. Site: 45,392 sq m (GRIHA), given elsewhere as 10.4 acres or 41,000 sq m. Built-up area: 70,865 sq m (GRIHA); other sources give 762,785 sq ft, 816,171 sq ft and "a million" sq ft. Height: ground plus two floors, the Corporate House ground plus three.
Cost: Rs 280 crore (US$63 million) in 2009, as listed by ArchDaily.
Status: in use as Suzlon's headquarters, sold in 2024 and leased back. No Commons photograph cleared our licence checks, so this post uses MOA diagrams only.
Christopher Charles Benninger was born in Ohio and lived most of his life in India. According to Wallpaper's obituary (10 October 2024), he co-founded the School of Planning at what is now CEPT University in Ahmedabad in 1971, alongside B V Doshi, set up the Centre for Development Studies and Activities in Pune in 1976, and died in Pune on 2 October 2024.
The client was a wind energy company that wanted its building to match its product. The architects' text on ArchDaily (published 14 January 2014) says Suzlon and the architect "pledged to create the greenest office in India", and that Benninger compared the Tanti family, whose Tulsi Tanti chaired the Suzlon Group, to the Sarabhais, the Guggenheims and the Rockefellers as patrons of architecture. CCBA's own project page adds that water, energy, air, sewage and trash were to be managed on site, with nothing removed from it.
In the architects' description in MGS Architecture, the campus had to bring all of Suzlon's business verticals together, each able to run on its own, and the client's needs changed "almost from week to week" during design. That explains much of the plan.
CCBA's 2009 project text on WorldArchitecture describes a suburban site of 10.4 acres in Pune, "about 100 miles from Mumbai", with temperatures from 25 to 40 °C between winter and summer. It says the blocks were kept to ground plus two floors to keep the scale of the neighbourhood, with only the Corporate House rising to ground plus three.
Sources label Pune's climate differently: hot and dry (the architects), hot and humid (bigEE) and warm and humid (CSE's 2014 benchmark analysis). For what it means for an ordinary house, see our guide to building materials in Pune.
The architects set the campus against the glass office tower, calling it a "land scraper" and "a counter blast to 'the glass box'". Their models are Fatehpur Sikri and the Meenakshi Temple complex in Madurai, from which they take overhangs, louvres, pergolas, courtyards, water and daylight.
Three ideas carry the design:
The plan answers the changing brief with a system rather than a fixed layout. The architects describe a simple arrangement of server spaces and served spaces:
The architects compare these modules, the silo-like fire stairs and the glass cylinders to a Lego set. The glass cylinders, at the circulation nodes, bring daylight and plants down to the basement entries and help ventilate the basement parking.
The central garden is the plaza for about 2,300 people. The reflecting pool sits at basement level, so the cafeteria and dining room open onto the water, with a cascade down three tiers behind and a long basin running east to a fountain. Elsewhere, the Wind Lounge is a chowk with kund-like steps down to a pool, shaded by solar panels that let filtered light through. Some searches call it the "Sun Lounge"; the architects call it the Wind Lounge, and we found no source for the other name.
Our diagram shows the zoning idea only. For the real site plan, floor plans, sections and elevations, see the drawings in the ArchDaily project gallery and CCBA's page. If you are documenting it for a studio, our case study field checklist covers what to record on site.
The section is where the climate strategy shows. The architects say the louvres, overhangs and operable windows led to "lower, thinner and longer" blocks, which raise the ratio of window to volume and so bring more daylight and air inside. The GRIHA case-study sheet lists facades facing north, south, north-west and south-east, external louvres shading all first- and second-floor windows, blocks that partly shade each other, and small terraces.
The structure is concrete with post-tensioned slabs, which GRIHA credits with 37% less structural concrete and 50% less structural steel; the baseline behind those percentages is not published.
The architects say they "relied exclusively on non-toxic and recycled materials". The published specifics are fewer than that claim suggests:
The architects say 75% of workstations have daylight and views out; Suzlon's 2010 release, on CSRwire, says about 90% of regularly occupied spaces get daylight. Both are design claims, not surveys. Lighting runs on daylight and occupancy sensors, and every desk has an LED light on a motion sensor (GRIHA).
The offices are air-conditioned. bigEE describes a water-cooled VRV system of about 1,000 tonnes of refrigeration, a fresh-air unit on every floor supplying 100% fresh air, and set points of 26 °C in summer and 23 °C in winter, with evaporative cooling in reception areas. GRIHA adds pre-cooling of fresh air and heat recovery. Synefra says the installed load came down from 6.5 MVA to 4 MVA.
On water, GRIHA reports a 65% cut in building use through low-flow fixtures, 55% recycled and reused on campus, and 50% less for landscape, all against its own benchmark.
The ratings are well documented. Synefra's release of 29 April 2010 says the Indian Green Building Council, which ran LEED in India under licence from the US Green Building Council, rated the campus Platinum with 57 points out of 58 applied for, and that India's ambassador to the United States, Meera Shankar, handed over the citation in Washington DC on 28 April 2010. Suzlon's own release puts the ceremony on Thursday 29 April. CCBA's text from December 2009, written before the rating, gives "56/57". GRIHA's official listing shows a final rating of five stars. For how these systems differ, read our guide to IGBC, GRIHA, LEED and ECSBC.
The energy numbers are less tidy. Four published figures for energy per square metre exist, and they differ:
Whichever figure you take, the campus sits below the Bureau of Energy Efficiency's five-star line of 100 for a mostly air-conditioned day-use office in that climate band, and far below the one-star cut-off of 200, as CSE applied them.
On-site renewables are the weak point. The architects claim 8% of annual energy from 154 kW of solar and wind on site; CCBA's 2009 text says 5%. Suzlon's 2010 release calls the campus 100% renewable, and the architects call it zero energy because the rest comes from Suzlon's own wind farms. The measured picture is smaller. bigEE's 2011 solar output of 127,299 kWh is about 2.3% of total use (our arithmetic), and bigEE says the small wind turbines were not working when it compiled its data. GRIHA lists 154.83 kW installed, but its own parts, 13.44 kW of solar and 18 turbines of 4.75 kW, add up to about 99 kW. And 127,299 kWh from 13.44 kW of panels would be roughly six times the 1,200 to 1,500 kWh per kW a year that the NDMC rooftop solar FAQ expects. We report the figures as published and flag that they do not reconcile.
Synefra's release headline called it the largest corporate campus in India to achieve LEED Platinum, and Construction World (January 2012) reported that it won the MIPIM Asia 2011 Gold award for best green building, presented in Hong Kong. CSE's 2014 analysis, which was critical of green ratings in general, found that two of nine rated corporate offices did not qualify for a BEE star label; Suzlon One Earth was not one of them.
Most of what is published comes from the architects, the developer and Suzlon; we found no independent post-occupancy study and no named critic's review we could open. Cost claims also vary: an extra cost of about 11% in the architects' text, about 2.5% overall, recovered in two to three years, in bigEE.
Ownership changed in 2024. Business Today reported on 4 September 2024 that Suzlon was selling the One Earth property for Rs 440 crore to OE Business Park Pvt Ltd, a vehicle held by funds managed by 360 ONE Alternate Asset Management, and would lease it back for up to five years. Suzlon's contact page still lists One Earth as its global headquarters.
Our reading, for studio projects and real offices:
One Earth is a working corporate office. Suzlon's contact page gives the address and says nothing about visits or tours, and we found no public visiting programme. Students who need access should write to Suzlon and to CCBA well ahead, and should not photograph inside without permission.
Christopher Charles Benninger and his Pune practice, CCBA (credited as CCBA Designs). Synefra Engineering & Construction conceived and managed the project, Environmental Design Solutions were the green building consultants, and Vascon Engineers were the prime contractor.
In Hadapsar, Pune, Maharashtra. Suzlon gives the address as One Earth, Hadapsar, Pune 411028.
Design began in 2005 according to CCBA's 2009 project text, or 2006 according to its current site, and the campus was completed in October 2009. It received its LEED Platinum citation in April 2010.
GRIHA gives a site of 45,392 sq m (about 10.4 acres in the architects' figures) and a built-up area of 70,865 sq m, of which 40,418 sq m is air-conditioned. Other sources give 762,785 sq ft, 816,171 sq ft or "a million" sq ft built up.