HCP Design's precinct in Varanasi: the route from the Ganga to the temple, the plan and 23 new buildings, Chunar stone and construction, the temples found during clearance, and lessons.
Shri Kashi Vishwanath Dham, widely searched as the Kashi Vishwanath corridor, is the redeveloped precinct around the Kashi Vishwanath temple in Varanasi, designed by HCP Design, Planning and Management of Ahmedabad and opened in its first phase on 13 December 2021. It links the temple of 1780 to the River Ganga through a gateway, a path of public buildings, an outer court and a stone court around the temple. Below: the brief, site, plan, section, Chunar stone and construction, the temples found during clearance, how the precinct changed, and lessons, with MOA diagrams. We stick to design and construction.
Kashi Vishwanath Dham: the facts
Architect and planner: HCP Design, Planning and Management, Ahmedabad, led by Bimal Patel. Contractor: PSP Projects (Open, 2021). Conservation of the temples found on site: Shivani Mishra and her firm JBN Exports, as Open reports.
Client: Shri Kashi Vishwanath Special Area Development Board (SKVSADB).
Location: Varanasi, between the temple and the Lalita, Jalasen and Manikarnika ghats.
Dates: HCP appointed in 2018; foundation stone 8 March 2019; phase 1 opened 13 December 2021; the river gateway was due to open by 15 February 2022. HCP lists the project as 2018 to 2022.
Area: sources differ. HCP gives a site area of 48,000 sq m; the Prime Minister's Office (PMO) gave about 5 lakh sq ft, against about 3,000 sq ft before; The Week gave "just over five hectares"; a 2025 article in InSite India gives 8.21 hectares.
Type: temple precinct and public realm: a stone court and colonnade, an outer court, a path of 23 new buildings for visitors, and the river gateway and ghats.
Status: in use and open to visitors. The temple itself, built in 1780, was cleaned but not altered.
HCP's project page says the firm was appointed in 2018 "to propose a comprehensive redevelopment plan" covering the temple and its precinct down to three ghats. In an interview with Ullekh NP, first published in Open in December 2021, Bimal Patel said the proposal was awarded in late 2018, when the purchase of properties for the corridor had already begun. By June 2019, NBMCW reported, HCP had submitted the detailed project report to the board.
The brief, as the client and architect describe it:
The Kashi Vishwanath temple in its present form was built in 1780 by Maharani Ahilya Bai Holkar of Indore, according to the Kashi official web portal run by Varanasi Smart City; two of its three domes were covered in gold given by Maharaja Ranjeet Singh in 1839. The Government of Uttar Pradesh took over the temple on 28 January 1983, and a trust manages it.
Before the project, The Week reported, only a few feet separated the inner sanctum from the boundary; the PMO put the earlier premises at about 3,000 sq ft. Between the temple and the river lay a dense quarter of houses, shops and lanes. The ground rises steeply from the river, as it does along the Varanasi ghats, and HCP says the new work "follows the existing levels and terrain of the site". For the materials ordinary buildings in this region use, see our guide to building materials in Lucknow and the UP plains.
Patel describes the design as a route with a sequence of thresholds; he called the walk "a slow unfolding of self-realisation" in his interview with Ullekh NP. The main ideas, from his interviews and HCP's page:
Read from the river, the plan has five parts:
On length and width, Open reported the corridor as 400 m from the ghats to the temple and 75 m wide; The Week also gave about 400 m. An earlier NBMCW report of January 2020 gave about 250 m. The real drawings belong to HCP, and its project page shows its own images.
Patel said the master plan was revised several times, for three reasons: temples found inside acquired houses, properties that became available as acquisition went on, and the chance to add a ghat and gateway on the river.
No source we found publishes levels or heights, so our section shows the principle only. The route climbs from the water by a pyramid of steps to the Ganga Dwar, runs up the main path along the existing slope with low new buildings on either side, reaches the Chowk, and steps down to the Parisar gateway, as Patel describes. The PMO said ramps and escalators were provided for older and disabled visitors. ThePrint reported, in September 2021, a platform at Lalita Ghat built out about 30 m into the river, partly with demolition waste.
The Parisar was "made entirely in Chunar stone from Mirzapur", the same stone used in the temple, Patel told Ullekh NP. Open quotes the board as saying the Parisar's colonnade and gateways were built from local Chunar stone "without any steel or concrete reinforcement", with traditional motifs. Open also lists red sandstone, Kota granite and Makrana marble among the materials. We found no published specification of stone sizes, joints or finishes. For how sandstone, Kota and marble compare in ordinary buildings, see our guide to natural stone for houses.
As houses were bought and taken down, shrines built into them came to light. Counts differ by date and source:
Patel said the temples were restored with a conservation architect and folded into the design. Open reports that Shivani Mishra's team cleaned stone with jaggery, fenugreek and guggul rather than chemicals. Patel told The Week that in many acquired homes the shrines had been treated "callously", their spires used as props; idols from home temples that were demolished were to be shown in a gallery on the path.
The sources say little about climate design. The Week gave about 70 per cent of the five hectares as open space, and Open said over 70 per cent of the redeveloped area would be green, naming rudraksha, parijat, ashok and bael trees. Services mentioned are toilets (about 190 seats, The Week), lockers, more than 300 CCTV cameras and baggage scanners (Open), and HCP's "unobtrusive security arrangements". Patel said existing sewer lines and a pumping station at Lalita Ghat handle the precinct's waste, though that pumping station was to be relocated. Lighting design is not credited in any source we found.
Scale and capacity. The PMO put the precinct at about 5 lakh sq ft, against about 3,000 sq ft before. Capacity figures vary: about 55,000 people at a time (The Week, 1 December 2021), 50,000 to 75,000 (the Prime Minister's speech, as The Week reported on 13 December 2021) and over 75,000 (Open).
Acquisition and rehabilitation. The PMO said more than 300 properties were bought by mutual negotiation, about 1,400 shopkeepers, tenants and homeowners were rehabilitated, and no case was pending in any court. Open reported 314 buildings demolished, against an initial target of 197, which had housed at least 1,400 shops. ThePrint reported ₹380 crore for property and ₹70 crore for rehabilitation. The Week (1 December 2021) recorded complaints over the demolition of small temples, shop clearances and unequal compensation, and Divisional Commissioner Deepak Agarwal's statement that no case was before any court.
Cost. The PMO gave phase 1 as built at about ₹339 crore (12 December 2021). In September 2021 the Divisional Commissioner told ThePrint a revised cost of ₹400 crore had been sent to the government for approval.
Critics and researchers. Historian Michael S. Dodson, writing in Platform on 14 October 2019 during the clearance, described the displacement of residents, including a family of renters he says got no compensation. Vera Lazzaretti's 2021 paper in the International Journal of Heritage Studies studies how the project was framed as heritage. Prof. V. N. Mishra of IIT BHU told ThePrint that the project lacked a detailed study, including of its possible effect on the river. Patel answered critics in Open: "Much care is being taken to ensure that the additions here fit well with the surrounding area." He told The Week that respect for heritage "must not paralyse us" from change.
Our reading, not the architects':
For another religious building where the route and the climate shape the plan, see our Lotus Temple case study.
The precinct is open to visitors and reached from the city side or from the river through the Ganga Dwar. The Kashi official web portal gives the address as Lahauri Tola, Varanasi 221001, lists the daily aartis, and links to online booking for Sugam Darshan. Check it for current timings and entry rules before you go.
HCP Design, Planning and Management of Ahmedabad, led by Bimal Patel, designed the precinct for the Shri Kashi Vishwanath Special Area Development Board. Open reports PSP Projects as the contractor.
HCP was appointed in 2018 and the foundation stone was laid on 8 March 2019. Phase 1 was inaugurated on 13 December 2021, and the river gateway was due to open by 15 February 2022. HCP lists the project as 2018 to 2022.
HCP gives a site area of 48,000 sq m, about 11.9 acres by our conversion. The PMO gave about 5 lakh sq ft, about 11.5 acres. The Week said just over five hectares and InSite India gives 8.21 hectares, so figures depend on what each source counts.
Mainly Chunar stone from Mirzapur district, the stone of the temple itself. The board says the Parisar colonnade and gateways were built without steel or concrete reinforcement. Open also lists red sandstone, Kota granite and Makrana marble.