HCP Design's New Parliament Building in Delhi: why the plan is a triangle, how the two chambers and lounge are zoned, how Tata Projects built it, and the dated record.
The New Parliament Building in New Delhi was designed by HCP Design, Planning and Management, the Ahmedabad firm led by Bimal Patel, and built by Tata Projects for the Central Public Works Department (CPWD). It is a triangular building of about 64,500 sq m beside the circular Parliament House of 1927, with the Lok Sabha, the Rajya Sabha and a central lounge in its three corners. The foundation stone was laid on 10 December 2020 and the building was dedicated on 28 May 2023. This case study covers design and construction only, with MOA diagrams.
New Parliament Building: the facts
Architect: HCP Design, Planning and Management. ArchDaily's project data names the lead architects as Bimal Patel, Bobby Desai, Kamlesh Mehta, Kahan Vyas, Ankit Mistry, Pradip Jadav, Dipak Kotecha and Niki Shah.
Engineers and consultants (as ArchDaily lists them): structure, NK Shah Consulting Engineers LLP and Structurally Integrated Design; MEPF, Tata Consulting Engineers; acoustics, Veneklasen Associates; landscape, Shaheer Associates.
Client and builder: CPWD for the Government of India; main contractor Tata Projects Limited.
Location: Plot 118, Parliament House Estate, New Delhi, part of the Central Vista redevelopment.
Dates: HCP appointed 18 October 2019; foundation stone 10 December 2020; main structure complete August 2022; dedicated 28 May 2023; sittings moved in on 19 September 2023.
Size: 64,500 sq m built-up (PIB's New India Samachar, PTI); ArchDaily gives 65,000 sq m. PTI calls it four-storey; New India Samachar says three storeys.
Status: in use as the Parliament House of India. The 1927 building is now called Samvidhan Sadan.
The old building was not designed for a Parliament. The Ministry of Housing and Urban Affairs' Central Vista site describes it as the colonial Council House, completed in 1927 and converted to Parliament House after independence. It sets out the government's case in four parts:
The same page lists letters asking for a new building from three Speakers of the Lok Sabha: Meira Kumar (13 July 2012), Sumitra Mahajan (9 December 2015) and Om Birla (2 August 2019). The project's guiding principles call the result "the first purpose-designed Parliament for independent India", to be used together with the old building once that is retrofitted.
According to the Central Vista site, CPWD advertised for design consultants on 2 September 2019. Six firms bid, a jury led by the Director of the School of Planning and Architecture marked their presentations, and HCP was appointed on 18 October 2019 on the highest combined quality and cost score. Construction was tendered separately: on 16 September 2020 Business Today reported that Tata Projects was the lowest bidder at ₹861.90 crore, ahead of L&T at ₹865 crore.
The new building stands on Plot 118 of the Parliament House Estate, close to the old building, which CPWD said would keep working throughout construction (Business Today). Tata Projects' newsroom puts the gap at under 100 m and notes that the building covers the entire plot, which shaped how it was built (see below).
Clearing the plot meant moving trees: the Central Vista site says 404 were transplanted to an NTPC eco-park at Badarpur, with 4,040 more to be planted there.
Patel's own explanation starts from the plot. In a 2021 interview with Quartz, republished by Scroll, he said the team began by studying the old building and its historical plans, and that "the adjacent triangular plot was found to be the ideal location for a new building." The plot's shape and the functions to be housed, he said, made a triangular plan the logical choice, a pure geometric form to stand beside the circular one.
The history he refers to is documented. Writing for PRS Legislative Research in December 2020, Chakshu Roy notes that Herbert Baker had proposed a triangular design for the original Council House and Edwin Lutyens a circular one, and that Lutyens' circle was built.
Patel has also given a symbolic reading. The Sunday Guardian (Dibyendu Mondal, 1 April 2023), reporting an explainer video by Patel, quotes him saying that sacred geometries celebrate triangles and trinities and citing the Sri Yantra. No source we read says the building is modelled on a particular temple. On style, he told Quartz that the architecture is inspired by the present building, with patterns and motifs drawn from India's arts and crafts.
ArchDaily's project text, published on 5 July 2023 with HCP's material, describes three core functions held by the triangle: the Lok Sabha, the Rajya Sabha and a central lounge. The Sunday Guardian places them: the Lok Sabha in the north-west corner, the Rajya Sabha in the south-west corner and the lounge in the eastern corner, around an open courtyard with a banyan tree. Offices line the outer edges.
| Chamber | Old building | New building |
|---|---|---|
| Lok Sabha | 552 at most (Central Vista site) | 888 seats |
| Rajya Sabha | 250 (New India Samachar) | 384 seats |
| Joint sitting | Central Hall, 436 plus temporary seats | Lok Sabha chamber, up to 1,272 |
New figures: New India Samachar and PTI.
The Lok Sabha's interior takes the peacock as its theme and the Rajya Sabha's the lotus, with the banyan as a third reference (STIRworld, Meghna Mehta, December 2020). The Sunday Guardian describes a green Lok Sabha, a red Rajya Sabha, two-seat desks with tablets, and peacock and lotus jaalis inscribed with verses from the Constitution that let daylight into both Houses.
The most detailed construction account is the Tata Group newsroom feature From Blueprint to a Landmark (Monali Sarkar and Haroon Bijli, February 2024). Its main structural points:
The exterior is red and white sandstone, chosen, Patel told STIRworld, to match the old building and the Central Vista. The Central Vista site names sandstone from Sarmathura in Dholpur district and granite from Lakha village, which it places in Jaisalmer; PTI places Lakha near Ajmer. PTI's fuller list:
For how the same stones behave in houses, see our comparison of Kota, sandstone, granite and marble.
Tata's newsroom says the company had 26 months from the foundation stone and split the work into a year of foundations and RCC and a year of finishing. STIRworld reported in December 2020 that the Supreme Court had halted construction until it decided the petitions, which it did on 5 January 2021 (see Reception). The feature gives these quantities: 1,75,000 cu m of concrete, 27,000 tonnes of reinforcement, 80,000 sq m of stonework and 1,350 km of cable. Two methods stand out:
On 29 August 2022, Tata Projects' CEO Vinayak Pai told PTI that the main structure was complete and internal finishing was under way.
The figures here are mostly design claims. New India Samachar describes the building as eco-friendly, with power consumption reduced by up to 30%, designed to meet needs for the next 150 years, and "platinum-rated". It does not name the rating body, and we did not find a certificate from GRIHA or another body; ArchDaily lists a GRIHA consultant. For what each rating measures, see our guide to green building certification in India.
The conditions set at environmental clearance are more specific. The Central Vista site gives an operational water demand of 7,818 kilolitres a day, of which 5,209 is to be recycled water, and sewage treatment capacity of 4,100 kilolitres a day for reuse in flushing and HVAC. The Supreme Court's 2021 judgment also required smog towers as part of the project and smog guns during construction (LiveLaw).
The building has been part of the wider public debate on the Central Vista project. The dated record:
Our reading, for practice and study:
If you are writing this up for a studio or thesis, our guide to documenting a building for a case study covers how to organise it, and our Hall of Nations case study covers another Delhi building shaped by a hard deadline.
The building is a working legislature, not a monument with open entry. We could not find an official page that sets out a public booking route, so we give no timings: check the Parliament site, sansad.in, or ask your MP's office. Photographs and project data are on ArchDaily's project page; the real drawings belong to HCP.
HCP Design, Planning and Management of Ahmedabad, led by Bimal Patel. CPWD appointed the firm on 18 October 2019, and Tata Projects built it.
The foundation stone was laid on 10 December 2020, construction went ahead after the Supreme Court ruling of 5 January 2021, and the building was dedicated on 28 May 2023. Sittings moved in on 19 September 2023.
No source we read says it is modelled on a particular temple. Patel explains the triangle by the shape of the plot and the three main functions, and has also cited triangles in sacred geometry, including the Sri Yantra.
888 in the Lok Sabha, 384 in the Rajya Sabha, and up to 1,272 in the Lok Sabha chamber for joint sittings.
A reinforced concrete frame clad in red and white sandstone from Sarmathura, Rajasthan, with granite, marble, Kesharia green stone, Nagpur teak, Bhadohi carpets and steel-framed chamber ceilings.